Increase Water Quality with Cyclical Aeration

With increased effluent pollution restrictions on municipal wastewater treatment plants, cities are pressed to find ways to economically increase their effluent quality with little to no funding. Many new NPDES permits require the reduction of nitrate and/or phosphorus, as nutrient removal becomes more prevalent due to the effects of nitrogen and phosphorus on discharge receiving streams. Biological Nutrient Removal (BNR) is a term describing the removal of nitrogen and phosphorus by utilizing the naturally occurring biology in activated sludge. Typically a BNR plant upgrade requires additional capacity in the form of an anoxic or anaerobic basin, which requires significant funding to complete. According to a fact sheet published by the US EPA “Biological Nutrient Removal Processes and Costs”, a plant between the flows of 0.1 to 1.0 MGD requires $6,972,000 per MGD for a BNR system upgrade, on average. One option to avoid the construction of an additional anoxic basin is to convert the aeration system to an intermittent aerobic/anoxic cycle structure. However, typical aeration equipment designed to operate 24/7 lacks the turndown capability required to promote anoxic conditions. Retrofitting these oxidation ditch systems with the proper aeration equipment and a cyclical aeration control (aerobic/anoxic cycling) strategy can eliminate the need for an additional anoxic basin.

Download the White Paper to learn more about the Biological Nitrogen Removal process and:

  • How upgrading the aeration equipment & control strategy can economically increase water quality
  • Retrofitting oxidation ditch systems with aeration equipment allows for cycling between aerobic & anoxic conditions
  • Expected nitrogen removal from cyclic aeration control

 Cyclical Aeration Control

Questions about how Cyclical Aeration Control can help your basin?